Winter Layout Work Update Part 1
CN 1906 pulls the first loads out of the recently-installed storage tracks in front of the Stelco (Walthers) rolling mill. Looks like they will soon have plenty more loads to pull! |
A few days spent working on the layout over the Christmas break yielded some significant progress on the layout, namely completing the trackage on the spur on the left (east) side of the layout. More industries to go and switch now!
Carpentry
The basic benchwork was already in place, including a sheet of plywood cut to fit in the available space; all that remained was to secure the sub-roadbed in place. It was decided to use the two “high-line” switches already in place to access the spur rather than run a new branch off of the existing yard lead. This meant that the spur would be at a higher elevation than previously planned – this allows a more eye-level view of activity on the spur, rather than a more eye-in-the-sky view. This also helps to blend the high line into the rest of the layout, rather than it creating a “stair case” illusion and seem to arbitrarily rise out of the rest of the layout. A total of seven supports were cut from spare 1x3” stock to elevate the plywood about four inches. Since the two high line switches were at slightly different elevations due to the grade that they are on, the elevation of the plywood sheet was set to split the difference between the two. Three supports were fastened to the benchwork lengthwise along the plywood and four were installed transversely – this stabilized the plywood and makes it resistant to any bumps or jolts on the rest of the layout’s benchwork. As this particular piece of plywood had been stored for a number of years, one end of the sheet (south end) had developed a significant warp (curl) that required a 2x4” attached transversely to the bottom to help straighten it out (2x4 was planed to be perfectly straight). The last step in preparing the plywood was to cut a hatch approximately 16” square into the middle; this not only allows access in the event of a derailment or electrical glitch, but will help with scenic-ing the layout as well. The seven risers (supports) were first screwed to the bottom of the plywood at pre-marked and measured locations. Once all were in place, the plywood was positioned at the appropriate height and the risers clamped in place while pilot holes were drilled and screws put in place. The sub-roadbed between the two switches on the high line consists of a segment of plywood approximately six inches wide; a tapered “bridge” piece was placed between this existing sub-roadbed and the newly installed plywood. Surprisingly, very little adjustment was needed to align the three pieces of plywood, and only some slight planing and sanding was required to smooth the transition from the high line grade to the level plywood surface.
Two CN locals are seen operating at the same time - CN 4775 is returning from spotting cars at Casco (near the bridge, out of sight at lower right), while CN 1906 lifts cars from the rolling mil (south face of building and part of the roof not yet re-installed). Scenery material will disguise the change in elevation between the high line spurs and the main line at bottom. The access hatch can be seen at right. |
Once the plywood was installed, it was full speed ahead with the trackwork for the new spur (actually two spurs that cross at a diamond, but referred to as the spur for clarity). The facing high line switches each feed one of two tracks that meet at a 90° crossing. The track on the spur is mostly code 83, a mix of Atlas, Shiniohara, and Peco. The north end of the spur consists of a Walthers rolling mill (to be featured in a later post) that was cut back to three segments (from original four) and another track next to the rolling mill that will serve as a bulk fuel dealer. Two tracks will go into the mill building itself, and another two storage tracks were laid next to the building to hold the loads for pickup. The rails have not yet been installed in the building, as the channels in the floor are intended for a cars' wheel flanges, not actual rails. Hence the gap is too narrow to lay rail (gauge is too tight), but that will soon be corrected. These tracks cross over the access hatch on three sides – each crossing was secured with extra spikes to ensure the alignment remains intact.
The CN local lifts loads out of the Stelco rolling mill. Looks like there are some loads to be shipped out of hte team track soon as well. The lumber yard will be located at far right (behind the team track). The Digitrax auto-reverser is being wired up at lower left. |
To power the new spur, a new track bus was run under the previously-unpowered high line and feeders installed between the rails and the bus wires. Since the high line circles around and forms a reversing loop with what is essentially the tail of the south yard lead (better-sounding name TBD), a Digitrax auto-reverser was purchased. Mark made quick work wiring up, so now we can run trains in a continuous loop up and around the high line.
After lifting cars from Stelco, two empty cars are lifted from the bulk fuel dealer. Extra track is stored temporarily at left. Note the high-tech temporary end of track device! |
Operations
Prior to completing the spur, there were only two industries already in place on the layout, the grain elevator and the spur near the bridge (at least for now, “Casco”). The addition of four new industries to switch will now provide at least enough work for two jobs: a yard job to handle the sorting of the cars and blocking of mainline freights, as well as switch the grain elevator and Casco, and a second job to go and switch the spur. With increased traffic on the layout, this will soon provide the opportunity to implement and learn about track clearances, car card systems, and how to develop a natural “flow” to operations between multiple operators. Can’t wait!
Lifting cars from the Stelco storage tracks at right; soon more empties will be spotted inside the building. |
Stay tuned for part II of the layout update sometime later in the week…
Thanks for looking,
Cheers,
Peter.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2017
(998)
-
▼
May
(155)
- Archive Compact model train layouts
- Model train transformers how to transform
- Wordless Wednesday 11
- Railroad tracks design
- Bachmann trains north star express
- Model train transformers 04-654
- Ideas Lionel model trains 90
- Context Model railway track building
- Atlas model train n scale
- Ideas N scale trains toronto
- Model train clubs
- Winter model train layouts
- Marklin model trains australia
- Throwback Thursday 14 TH B GP7 77 at Guelph Juncti...
- Railway track quality index
- Get Model train kits ho scale
- N scale train uncoupler
- Outdoor ho trains
- G scale model train videos youtube
- Model train track plans software free
- Useful Scale train club ru
- Popular Bachmann trains prices
- Share Atlas model trains ho
- Choice Ho scale model train layouts kits
- PDF N scale model train layouts youtube
- Cool Model train tree accessories
- Here Ho train parts accessories
- Context Used ho model train layouts for sale
- N scale model railroad magazine
- Next topic G scale model train locomotives
- Discuss Model train scale warhammer
- Context Ho scale train set layouts
- Here Model trains how to get started
- N scale model railroad books
- Model train sets thomas
- Share Craigslist ho trains
- Share Mth electric trains repairs
- Bachmann model railroad club magazine
- Next topic Model train transformers cybertron star...
- Archive G scale model train starter sets
- Model train expo brisbane
- Here Railroad tracks braces
- Get Model railroad printable buildings
- Get Model train track layout rules
- Bachmann trains new releases 2012
- 3d models subway train
- Context G scale youtube train videos
- Popular Ho trains discount
- Most Used Train models in delhi
- Cool Model train cardboard buildings
- Guide Model train transformers battle game
- Guide Model trains australia ebay
- Mth trains battery replacement
- Discuss Lionel model trains ken
- Discount model trains addison
- Next topic Ho trains louisville ky
- Learn Ho scale train yards
- Model train track layout engineer utah
- Here G scale train plowing snow
- Most Used G scale trains engines
- Australian brass model trains
- Chapter Ho model trains challenger
- Model railroad video camera
- Model train layouts columbus ohio police
- Knowing X scale model trains
- Model train building for beginners
- Liliput ho trains
- Useful Scale model trains wiki
- Model train transformer hot wire cutter
- Learn Bachmann trains indianapolis
- Topic Railroad tracks in east texas
- Get Ho model trains atlas dcc equipped
- Cool Key train models
- Learn Railroad models
- Popular Lionel model trains buildings
- Model train transformers bot builder
- Ho train set mountains
- Learn Ho american trains
- Here Mth trains pittsburgh
- Topic G scale train overhead track
- Small n gauge model railroad track plans
- Topic Trains models youtube
- Model railroad transformer voltage
- Share Mth train tips
- Model railroad deciduous trees
- Mth trains european
- is the trend of today's popular content, small ch...
- N scale trains kelowna
- Archive Lionel model trains 027 gauge lionel
- Allstate ho train set
- Topic G scale train batteries
- Popular G scale train ballast
- Brass model train dealers
- Organizer Railroad tracks fahrenheit 451
- Ideas N scale model trains marklin
- PDF G scale train dealers
- Genesis ho trains
- Model trains minneapolis
- Mth trains heritage
- Scale model train buildings
-
▼
May
(155)
About Me
- Unknown
0 comments:
Post a Comment